• River-type HEPPs
  • HEPPs with reservoir

As Sergrup one of our areas of activity are the irrigation project. The planning of several dams, ponds and irrigation projects are carried out by us. We also offer our services to public and private organizations.

The aim of pumped storage HEPPs is to store water during low energy demand and produce hydroelectric energy during peak energy demand. Ser Group serves for both public enterprises and private institutions in this field.

As Ser Group Company, one of the activity fields of us is drinking water and sewerage projects. Planning works for drinking water dams, water pipelines and sewerage systems are applied for both public enterprises and private institutions.

As Ser Group Company, one of the activity fields of us is irrigation projects. Planning works for various dams, small dams and weirs are applied for both public enterprises and private institutions.

As Ser Group Company, one of the activity fields of us is to apply hydrologic and flood studies for various types of structures. Many hydrologic works for different types of dams, small dams and weirs are applied. In addition to that stream remediation and flood studies are applied for various types of projects.

Earth, loose soil and rocky slopes can be stabilized by different methods. Before application detailed evaluation of these systems in terms of their advantages and disadvantages is very compulsory.

Detailed Info
1. PHASE BEFORE INVESTMENT
  • Assessment of the present status of the project in economic manner.
  • Assessment of the present status of the project in economic manner. b. For the purpose of taking the project into action in a reliable and efficient way, making of hydrology formulation and optimisation studies, installed power and operation studies based on the final project.
  • Following the making of the investment decision, preparing the documents for permission and other approval procedures required for license application.
  • Informing the investors for the agreements required to be conducted with the related institutions and organisations pursuant to the related laws and secondary legislations.
  • Directing the official relations with the General Directorate of Energy Affairs of the Ministry of Energy, TEIAS, TEDAS, Ministry of Environment and Forest and all related regional directorates, DSI and EMRA, all regional administrations (governorship, regional governorship, private provincial administrations, forest enterprises, land offices, General Directorate of Highways).
2. INVESTMENT PHASE
  • In order to complete the plant with optimum size and cost for a trouble-free commercial operation period, control of the Final and Implementation Projects, selection of the project company;
  • Preparing all construction, hydro-mechanical, electro-mechanical, energy transmission line specifications;
  • Preparing the administrative specifications;
  • Preparing the present map works, regional settlement plans and expropriation plans;
  • Geological etude and drilling works;
  • Tendering the construction, hydro-mechanical, electro-mechanical, energy transmission line works;
  • Control of appropriateness of all construction and hydro-mechanical fabrications to be executed in-site to scientific methods and contemporary construction techniques;
  • Supervising service for electro-mechanical installation works.
3. OPERATING PHASE
  • Approval of all projects by the related central and regional administrations in accordance with the protocol signed between State Hydraulics and General Directorate of Energy Affairs,
  • Provisional acceptance procedures of the plant by the Ministry of Energy and Natural Resources, General Directorate of Energy Affairs and State Hydraulics,
  • To make the necessary applications to TEIAS PMUM for the sale of energy.